No. 3 Factory was built and put into use (as a production workshop for BFS, vial/ampoule integrated line, oral liquids line and non-PVC soft bag production lines)
No. 2 Factory was completed and put into use (as the main production and testing workshop for purified water, injection water, liquid preparation system, etc., equipped with FAT professional acceptance center)
On June 18, the first pile of Highfine Intelligent Manufacturing Building was laid. It has a three-story equipment manufacturing center and a five-story office building with a construction area of 60,000 square meters.